Open the metal power supply box on the camera
enclosure and remove cardboard packing
materials.
REMOVE INSERT
Carefully unpack both boxes and compare
with parts list.
SET-UP PROCEDURE
See supplied Model 1001A Installation and Operation Manual for Class I Purging Set-up.
The use of a temporary SCFH flowmeter is unnecessary. Use the permanently installed flowmeter on the swing
panel in the Purge/Pressurization Unit.
See supplied Model 1001A Installation and Operation Manual for additional installation and operation information.
CONNECTION SIZES, LENGTHS & BENDS
System Supply Camera Supply Camera Reference
3/8” OD SS Tubing SUPPLIED SUPPLIED
Fully Reamed 3/8” Poly Tubing 1/4” Poly Tubing
MAXIMUM:
100 ft MAX
100 ft MAX
20 ft / 10 bends
GAS SUPPLY
(System Supply)
CAMERA
REFERENCE
CAMERA
SUPPLY
PROTECTED
CAMERA
ENCLOSURE
PEPPERL FUCHS
+
PURGE/PRESSURIZATION UNIT
7
8
9