Iroquois Jr./Sr. High School – Digital Camera System - 12/13 Form of Proposal
Iroquois School District Page 1 of 2
REVISED
PROPOSAL FOR A DIGITAL CAMERA SYSTEM
FOR
IROQUOIS JR./SR. HIGH SCHOOL
Iroquois School District Date _____________________________________
800 Tyndall Avenue
Erie, Pennsylvania 16511 Bid From _________________________________
Board of Education:
We propose to do all of the Digital Camera System and Related Construction Work for Iroquois Jr./Sr. High
School as specified in conformity with the plans and the specifications as prepared by Hallgren, Restifo, Loop
& Coughlin, Registered Architects, and after an examination of the site and all of the contract documents,
including the Instructions to Bidders, this Form of Proposal, the General Conditions of the AIA, Supplementary
General Conditions and Special Conditions, we submit this proposal and enclose the bid security in the
minimum amount of ten percent (10%) in the form of a certified check or bid bond made payable to the District,
which is to be retained by them, if we fail to furnish approved bonds and execute a contract after the issuance
of an award. Should the District fail to make an award through no fault of ours, the District shall return the bid
security to us within sixty (60) days.
We understand that the District reserves the right to reject any or all of the proposals or part thereof or items
therein, and to waive technicalities. It is further understood that competency and responsibility of bidders will
receive consideration before award of this contract.
The bidder shall submit this Bid with the understanding that the work on this project will begin Friday, June 6,
2014 and must be completed by Friday, August 1, 2014. It is further understood, however, that any
extensions of time, regardless of cause, beyond the above date, must be requested by a letter originated by
the Contractor and the School District must grant such extension by letter prior to same becoming effective.
BASE BID PROPOSAL
The Bidder agrees to perform all of the work as described in the specifications and/or shown on the drawings
for the "Digital Camera System at Iroquois Jr./Sr. High School" for the sum of:
_______________________________________________________________________________________
_____________________________________________________ DOLLARS ($_______________________)
ALTERNATES AND UNIT COSTS
The contractor shall indicate below the costs requested which shall form the basis for any additions,
substitutions or deletions of work required by the Owner. These costs shall reflect the total cost to be
deducted including all related work regardless of nature, labor, material, installation, transportation, taxes, if
any, overhead and profit, demolition, or any other expense associated with the work. Failure to completely fill
out the entire proposal will be grounds for rejecting the proposal.
ALTERNATE #1
Delete all stadium work as specified, DEDUCT from the Base Bid the sum of:
________________________________________________________________________________________
________________________________________________________ DOLLARS ($____________________)
Vista de pagina 4
1 2 3 4 5 6 7 8 9 10 ... 20 21

Comentarios a estos manuales

Sin comentarios